[[Tasks at Site]] --Arrived 11:30 and left 13:20 (ASTE Site). --I searched a box that Mr. Tsukagoshi needs (an EthernetLite device), but no was necessary, because he did can repair before that I find it. --I put in order 4 boxes (devices) in red 40 ft container. --Tsukagoshi san makes the backup COSMOS. He finished. --Tsukagoshi repairs the weather monitor. --Check the generator #7001 and #7002. ---#7001 12425hrs. #7002 10494hrs. ---South:closed 12790L, North:open 16000L. -Arrived 11:30 and left 13:20 (ASTE Site). -I searched a box that Mr. Tsukagoshi needs (an Ethernet-Lite device), but no was necessary, because he did can repair before that I find it. -I put in order 4 boxes (devices) in red 40 ft container. -Tsukagoshi san makes the backup COSMOS. He finished. -Tsukagoshi repairs the weather monitor. -Check the generator #7001 and #7002. --#7001 12425hrs. #7002 10494hrs. --South:closed 12790L, North:open 16000L.