[[Tasks at Site]]
-Arrived 10:40 and left 16:20 (ASTE Site).
-Backup Data.
-We repair the problem in subreflector and check it doing pointing.
-Check the Generator #7002 and #7001.
--#7001 11028hrs. #7002 9644hrs.
--South: open 7500L, North: closed 10200L.
-aste-1c/2c下UPS×2の接続確認
-MISTI装置の調査
-電源コンテナ内電源周り写真取り
-衛星通信接続の確認、UPS及びタップ清掃
-