[[Tasks at Site]] -Arrived 10:30 and left 19:00 (ASTE Site). -We meet with Komatsu people in ALMA gate at 9:00. -Generator maintenance: --We talked with Komatsu people about the problem in generators. -Skid loader. --The truck driver arrive the ASTE Site at 18:00 (he has a lot of problem with the truck by Paso Jama). --He gives me the "Guia de despacho". --We need go to search to truck driver to Paso Jama because we didn't know where was he (we didn't have cellular signal). -Start order in 20 ft red container. -Start to repair the heater in Antenna veranda. * Repair the heater in Antenna [#j801ceb8] |CENTER:&ref(DSCN2571.JPG,around,30%,,);&br;Part cheking|CENTER:&ref(DSCN2572.JPG,around,30%,,);&br;Part cheking (Other side)|CENTER:&ref(DSCN2575.JPG,around,20%,,);&br;Heater (inside left)|CENTER:&ref(DSCN2577.JPG,around,20%,,);&br;Heater (inside right)|CENTER:&ref(DSCN2578.JPG,around,30%,,);&br;Heater (inside)| * Repair cables in Air Conditioner system Antenna [#j801ceb8] |CENTER:&ref(DSCN2581.JPG,around,20%,,);&br;Only repair 2 cables (other cables are short for cut and repair)|CENTER:&ref(DSCN2582.JPG,around,30%,,);&br;Panel| * Skid loader [#j801ceb8] |CENTER:&ref(DSCN2587.JPG,around,30%,,);&br;Truck|CENTER:&ref(DSCN2588.JPG,around,30%,,);&br;Skid loader|