#calendar2(off)

#br

** Tasks for specific issues [#naab30be]

*** Investigation of unstable signals in BAND8 (2016 09-12) [#mf753740]
-- [[2016-09-16 キャビン内ケーブル揺すり>Observing Log/B8D3signals_20160916]]
-- [[2016-09-17 CONT RAWデータのFFT>Observing Log/B8D3signals_20160917]]
-- [[2016-09-23 受信機FANの影響確認>Observing Log/B8D3signals_20160923]]

#br

** TESCAM Phase III (2016/3-7) [#ce41b9b7]
- [[Observing Log/TESCAM_PhaseIII_week1]] (3/15-22) 現地作業引継ぎ、VLBIコンテナ内でのDewar作業、He配管作業手順の確認
- [[Observing Log/TESCAM_PhaseIII_week2]] (3/23-29) Dewar 組み上げ、He配管作業
- [[Observing Log/TESCAM_PhaseIII_week3]] (3/30-4/5) Dewar搭載、冷却開始
- [[Observing Log/TESCAM_PhaseIII_week4]] (4/6-4/12) 再冷却
- [[Observing Log/TESCAM_PhaseIII_week5]] (4/13-4/19) FW 組み上げ、dark test、雪
- [[Observing Log/TESCAM_PhaseIII_week6]] (4/20-4/26) 積雪、ASTE道開通待ち、dark test
- [[Observing Log/TESCAM_PhaseIII_week7]] (4/27-5/03) FW搭載、light test
- [[Observing Log/TESCAM_PhaseIII_week8]] (5/04-5/10) CSV観測開始、雪
- [[Observing Log/TESCAM_PhaseIII_week9]] (5/11-5/17) 雪、データ解析、dark test
- [[Observing Log/TESCAM_PhaseIII_week10]] (5/18-5/24)

** DESHIMA Phase I (2017/9-12) [#v821ede6]
- [[Observing Log/DESHIMA_PhaseI_week1]] (9/19-26) 現地確認、19インチラック撤去、DESHIMA受け入れ
- [[Observing Log/DESHIMA_PhaseI_week2]] (9/27-10/3) 搭載準備、コンプレッサー・チラー準備
- [[Observing Log/DESHIMA_PhaseI_week3]] (10/4-10/10) クライオスタット、エレキ、コンプレッサー等搭載
- [[Observing Log/DESHIMA_PhaseI_week4]] (10/11-10/17) 低温配線修理。光学系、バッテリー等搭載
- [[Observing Log/DESHIMA_PhaseI_week5]] (10/18-10/24) First light! 窓を閉じてのKID雑音測定。窓を開けての副鏡調整 with Saturn。
- [[Observing Log/DESHIMA_PhaseI_week6]] (10/25-10/31) サブレフ調整や、データ解析手法の確立を目的とした、Saturn, Neptune, OriKLなどの観測: Ori-KL CO(J=3-2) preliminary detection.
- [[Observing Log/DESHIMA_PhaseI_week7]] (11/01-11/07) サブレフ調整に充分なデータを取得。de:codeの開発/改良。OriKL, NGC253のraster観測でCO(3-2)を検出
-[[Observing Log/DESHIMA_PhaseI_week8]] (11/08-11/14)
-[[Observing Log/DESHIMA_PhaseI_week9]] (11/15-11/21)

Front page   Edit Diff History Attach Copy Rename Reload   New Page list Search Recent changes   Help   RSS of recent changes