- History
- View the source.
- Observation and Analysis/SubRef has been deleted.
- What's this page?
- This page is provided for the ASTE commissioning team to share the information on "subreflector measurements", which involves optimization of focusing and instrument pointing. Feel free to edit the page and then leave your revision history.
- Revision history
- 23-Mar-11 - YT - modified for the 2011/Apr. runs. ! STILL EDITING !
- 26-Apr-10 - BH - added predicted temperatures of planets in April-May 2010.
- 16-Apr-10 - YT - modified for runs during April-May, 2010.
- 15-Aug-09 - YT - modified for further runs in early September, 2009
- 18-Jun-09 - YT - modified.
- 18-Jun-09 - SH - created.
- Contents
-
Observation and reduction manuals†
- Observing manuals
- Reduction manuals
- Misc pages
Latest commissioning plan (as of subref)†
Reference sources†
- expected antenna temperature of the target(s)
- main-beam filling factor: bff = 1-exp[ - ln(2)*[ D(obj)/θ(HPBW) ]^2 ],
- D(obj): apparent diameter of a planet, θ(HPBW): beam FWHM (D and θ should be measured in the same units.)
- assuming the main beam is approximated with a Gaussian function.
- 2011/04/10 (ASTE 22" beam, ηmb = 0.6, ephemeris from JPL Horizons)
#ref(): File not found: "azelp_110415UTC.png" at page "Observation and Analysis/SubRef"
- Figure: AZ-EL plot. The horizontal axis represent time (UTC). Note JST=UTC+9. If you want to convert Chilean time (AST) to JST, add 13h to AST (i.e. JST=AST+13).
Schedule and staffing plan†
# of days | date | staff | tasks |
Day 0 | 4/07(thu) | YT, YS, YO | Focus point search, Kisa update |
Day 1 | 4/08(fri) | YT, YS, YO | Focus point search, Kisa update |
Day 2 | 4/09(sat) | YT, YO | Focusing * |
Day 3 | 4/10(sun) | YT, YO | Focusing * |
Day 4 | 4/11(mon) | YW, YT | Focus point search, Kisa update |
Day 5 | 4/12(tue) | YW, JU | Focusing * |
Day 6 | 4/13(wed) | YW, KM, HB | Focusing * |
Day 7 | 4/14(thu) | YW, KM, HB | Focusing * |
Day 8 | 4/15(fri) | YW, HB | Focusing, Kisa update * |
Day 9 | 4/16(sat) | YS, HB | Focusing confirmation of Kisa * |
Day10 | 4/17(sun) | JU, HB | Focusing (backup) * |
Day11 | 4/18(mon) | YT | Inst. pointing w/ iOPT |
Day12 | 4/19(tue) | YT | Inst. pointing w/ iOPT |
Day13 | 4/20(wed) | JU, CH, YT | Inst. pointing w/ iOPT, Kisa update |
Day14 | 4/21(thu) | YS, CH | Inst. pointing w/ iOPT, confirmation of the Kisa |
Day15 | 4/22(fri) | YS, CH | Inst. pointing w/ iOPT (backup) |
Day16 | 4/23(sat) | YS, CH | Inst. pointing w/ iOPT (backup) |
Day17 | 4/24(sun) | JU, CH | Inst. pointing w/ iOPT (backup) |
Day18 | 4/25(mon) | TT, YO | Inst. pointing w/ CO sources |
Day19 | 4/26(tue) | TT, JU | Inst. pointing w/ CO sources (backup) |
Day20 | 4/27(wed) | TT | backup |
Day21 | 4/28(thu) | TT | backup |
- note (*): when it is windless (v_wind < 5 m/s), optical pointing may be performed.
- note: CH = Chihori Hara, HB = Hiroyuki Baji, JU = Junko Ueda, KM = Kazuyuki Muraoka, TT = Takashi Tsukagoshi, YS = Yoshito Shimajiri, YT = Yoichi Tamura, YW = Yoshimasa Watanabe
Subref measurement overview†
はじめに - 背景と獲得目標†
獲得目標は下記のとおり。
- 副鏡位置X, Y, ZのEL依存性を決定(従来どおり)
#ref(): File not found: "subref_geom.png" at page "Observation and Analysis/SubRef"
図:副鏡位置座標XYZΦの定義
測定の概要†
簡単にフォーカスを合わせる†
- 測定
- 指示書: jupzb8.start (for B8QM), jupzc3.start (for CATS345)
- subref offset (dx, dy, dz) = (0, 0, 0) とする
- 解析
副鏡位置X,Y,ZのEL依存性の測定†
連続波ポインティング/ビームマッピングによる器差追い込み†
外気温変化時の副鏡位置変化の測定 (advanced)†
最適なtilt位置の測定 (advanced)†
comment†