Tasks at Site
2012-04-08
- ASTE site: Arrived 08:40, left 17:00
- Oshima, Iwashita, Sato, Takekoshi, Minamidani
- Checked TES camera dewar (Cont.)
- Checked cold optics part
- Checked Band 2 FPM
- Brought down two sets of 4K Helium compressors (indoor and outdoor units) from the telescope.
- Put one set of 4K Helium compressor to the iron frame.
- Don Esteban office
- Hirota
- Checked TES camera Backend rack
- Checked DfMUX boards
- Checked Timing board
- Checked IRIG-B TTL-to-RS485 converter