- History
- View the source.
- Tasks at Site/2012-02-15 has been deleted.
- 1 (2012-02-15 (Wed) 21:02:59)
Tasks at Site
- Arrived at 10:40 and left 13:00 (ASTE Site).
- Put a lock in the people door east defense and put the keys in the A3 key and back key box.
- I check the perimeter ASTE site, is Ok.
- Handa and Yamasaki-san check the antenna.
- Iwashita-san and me check the generator room.
- Check a power switches in a panel in the right side, close the south door.
- Check few switches inside the panel inn the 65099 generator.
- I put the numbers for the switch manual in both new generators.
- Put the old keys in the old generators (white container).
- Check the Generator #65098.
- #65098 198hrs. #466,59hrs.
- South: closed 13.800L, North: open 10.400L.