[[Tasks at Site]]

-Arrived at 11:00 and left 13:30 (ASTE Site).
-Tamura-san makes backup data.
-I coordinate the Juan Donoso works at the site (I told him about that we want he continuum working when we go to the site, he was agree).
-The shell truck put 14.700 L, 300 less of the correct, I scan the “Control de Carga / Descaga” (look Wiki page) document with the observation “Sellos Ok, pero faltaban 300 litros en proyecto ASTE”, we need ask to Komatsu or Shell people.
--South tank before supply was 9.500 after 14.300.
--North tank before supply was 6.800 after 11.700.
-Check the generator #7001 and #7002.
--#7001 12938hrs. #7002 10927hrs.
--South:closed 14.300L, North:open 11.700L.
--We put 7 small and 1 big bottles of oil to #7001 generator.
--We check the voltage in the #7002 generator, now is ≈ 105 [V].