[[Tasks at Site]] -Arrived at 10:40 and left 15:20 (ASTE Site). -Tamura-san makes backup data. -Tamura-san tuning the UPS in control room. -Tamura-san and I prepared the grease for the EL, AZ antenna system. -I coordinate the Juan Donoso works at the site. -We had a problem in the Control room: --Usually the voltage in the Control room is between 105 [V] and 110 [V]. --When we make a Switch Genset, the voltage in the control room usually is a pick of 120 [V] for 1 or 2 seconds. --Today we had a pick of 120 [V] for 10 minutes, after comeback between 105 [V] and 110 [V]. --For this reason the UPS was automatically disconnect for 10 minutes of the generator energy and give energy to the PC from the internal battery. -Check the generator #7001 and #7002. --#7001 12938hrs. #7002 10832hrs. --#7001 12983hrs. #7002 10832hrs. --Switch Genset, #7001 --> #7002. --South:closed 9500L, North:open 8100L.