[[Tasks at Site]] -Arrived 10:45 and left 16:00 (ASTE Site). -We check the switches OFF in ASTE Site. -We finish of repair the heater in Antenna veranda. -We meet with Joaquin Collao in ASTE Site at 11:30 AM, he want ask us about the next change of generators. -We opened the South tank fuel. -We start the #7002 generator. -Check the generator #7002. --#7001 XXXXXhrs. #7002 8753hrs. --South:open 10000L, North:closed 7200L --Tomorrow we will check the hours in #7001. -We start the site. -We check the subreflector position. -We put empty bottles in the pick up truck, for put water in Don Esteban and return to ASTE Site. -Komatsu people check the measures in the generator room. * Repair the heater in Antenna [#j801ceb8] |CENTER:&ref(DSCN2594.JPG,around,30%,,);&br;Fuse and sensor inside the heater|CENTER:&ref(DSCN2596.JPG,around,30%,,);&br;Zoom Fuse and sensor inside the heater|CENTER:&ref(DSCN2602.JPG,around,30%,,);&br;Temperature Fuse|CENTER:&ref(DSCN2603.JPG,around,30%,,);&br;Thermostat|CENTER:&ref(DSCN2604.JPG,around,30%,,);&br;Before changing|CENTER:&ref(DSCN2606.JPG,around,30%,,);&br;After changing|CENTER:&ref(DSCN2609.JPG,around,30%,,);&br;Modificated fuse| * Subreflector Antenna checking [#j801ceb8] |CENTER:&ref(DSCN2610.JPG,around,30%,,);&br;Cheking Subreflector|CENTER:&ref(subref_rot-1.4deg.jpg,around,30%,,);&br;Cheking Subreflector(rotated -1.4deg)|