[[Tasks at Site]]

-Arrived 10:45 and left 16:00 (ASTE Site).
-We check the switches OFF in ASTE Site.
-We finish of repair the heater in Antenna veranda.
-We meet with Joaquin Collao in ASTE Site at 11:30 AM, he want ask us about the next change of generators.
-We opened the South tank fuel.
-We start the #7002 generator.
-Check the generator #7002.
--#7001 XXXXXhrs. #7002 8753hrs.
--South:open 10000L, North:closed 7200L
--Tomorrow we will check the hours in #7001.
-We start the site.
-We check the subreflector position.
-We put empty bottles in the pick up truck, for put water in Don Esteban and return to ASTE Site.
-Komatsu people check the measures in the generator room.

* Repair the heater in Antenna [#j801ceb8]
|CENTER:&ref(DSCN2594.JPG,around,30%,,);&br;Fuse and sensor inside the heater|CENTER:&ref(DSCN2596.JPG,around,30%,,);&br;Zoom Fuse and sensor inside the heater|CENTER:&ref(DSCN2602.JPG,around,30%,,);&br;Temperature Fuse|CENTER:&ref(DSCN2603.JPG,around,30%,,);&br;Thermostat|CENTER:&ref(DSCN2604.JPG,around,30%,,);&br;Before changing|CENTER:&ref(DSCN2606.JPG,around,30%,,);&br;After changing|CENTER:&ref(DSCN2609.JPG,around,30%,,);&br;Modificated fuse|

* Subreflector Antenna checking [#j801ceb8]
|CENTER:&ref(DSCN2610.JPG,around,30%,,);&br;Cheking Subreflector|CENTER:&ref(subref_rot-1.4deg.jpg,around,30%,,);&br;Cheking Subreflector(rotated -1.4deg)|

Front page   Edit Diff History Attach Copy Rename Reload   New Page list Search Recent changes   Help   RSS of recent changes