- History
- View the source.
- Tasks at Site/2012-05-23 has been deleted.
- 1 (2012-05-25 (Fri) 05:05:44)
Tasks at Site
2012-05-23(Wed)
- ASTE site: Arrived 09:00, left 18:00
- Oshima, Sato, Hirota
- Ichimura, Hara, Furugaki (MITSUBISHI)
- MITSUBISHI maintenance
- Checked sub-reflector
- ==> Tilted by sub-ref chopper
- Set a light (100V 60W) at the upper cabin
- connected to lantap11 port4
- Checked by chopper wheel in front of the dewar window
- Cleaned up obs. container and VLBI container
- Checked beam pattern measurement system
- Prepared python scripts for beam pattern measurements