Tasks at Site
- Arrived at 09:40 and left 13:30 (ASTE Site).
- I make backup data.
- We prepare some things for the next change generator, mainly order the tools and order generator room.
- We checked the oil in the #7001 generator, is low.
- We checked the status of the new generator, it's Ok.
- Panel switches.
- Ethernet cable panel.
- Parameters: hrs, Hz, Average V L-N, Average V L-L, kW, RPM, Oil Press., Temp., Fuel (%), Battery, Fuel valve and Drain valve.
- Switch Genset, #7001 --> South generator
- Check the new generator "South generator".
- South generator 98.42hrs.
- South:open 6900L, North:closed 4400L.
- We disconnect the power lines of the #7001 generator.