NAOJ GW Elog Logbook 3.2
Overview: Tested the cryocooler operation with water supply to Matsuo-san lab shut off.
Conclusion (Hypothesis): Closing supply at Matuso-san lab may have cut off the supply to the GWSP cryocooler.
Details: I turned on the cryocooler at 8:27. The cryocooler turned off on it's own at 8:47. The following errors were displayed:
- Helium Temperature Err
- Water Temperature Err
- Water Flow Err
Observations: The cryocooler body was not hot. The helium supply tube was hot. The return supply tube was cold. The Temperature of both water supplies was normal. Note: All these temperature measurements are subjective to me holding the parts.
I am thinking that the water supply to our section was also cut off by the valve Matsuo-san shut.
Next: Confirm if the water is flowing into the cryooler.
It truns out that there was some issue with the cooling tower on top of building 2 so the water being pumped was warm. I will do a standalone test next time the water supply to Matsuo-san lab can be turned off.