MarcEisenmann - 16:20, Friday 16 February 2024 (3443)
Absorption L20#2
[Marc, Shalika]
previous measurement power Pt = 4.82+/-0.17W
installed L20#2 AN-091-063-D25,4-20
Pt=27.3+/-1mW
position of Y changed from 121 to 61
Pin=31.9+/-1.1mW
Z SCAN
HWp changed to 28deg, Pt=4.78+/-0.17W
long z scan Fri, Feb 16, 2024 3-53-28 PM
edge in z, 38.25 and 50.1mm, z center=44.175mm
resaligned DC @ zcenter
long z scan Fri, Feb 16, 2024 4-10-40 PM.txt
Pt = 4.85+/-0.17W
MAPPING
7.5mm radius, 0.2mm step, 50mV senstivity
Fri, Feb 16, 2024 4-22-21 PM.txt
measurement finished.
Pt = 4.87+/-0.17W during measurement.
I turn off laser for the week end