Warning: Undefined variable $s in /wwwsto01/wwwusers/gw-elog/osl/classes/DAO.php on line 959
NAOJ GW Elog Logbook
LOG-IN
Displaying report 1-1 of 1.
R&D (Cryogenic)
Print this report.
KoheiMitsuhashi - 15:00, Tuesday 27 December 2022 (3133)Get code to link to this report
try to measure the ring down and fit the data

[Mitsuhashi,Shalika]

This elog is about doing ring down measurement, and fit the data

What we did:
When we try to measure the ring down. The pictuere from osiloscope was attached.

The supposed decay time from the picture was around 1μs, and the result of fitting the data show that decay time is 0.9μs.
This value is comparable to time resolution of the photo detector we use now.

What we will do:
We check how the photo detector and AOM works when we shut down a lazer. 
And we will try to reinstall a photo detector that has hight time resolution.

Images attached to this report
3133_20221227065849_ringdown.png 3133_20221227070317_resultoffitting.png