Warning: Undefined variable $s in /wwwsto01/wwwusers/gw-elog/osl/classes/DAO.php on line 959
NAOJ GW Elog Logbook
LOG-IN
Displaying report 1-1 of 1.
R&D (FilterCavity)
Print this report.
MarcEisenmann - 00:20, Thursday 26 May 2022 (2958)Get code to link to this report
shift input oplev reinstalled

Marc Michael

Today we brought 2 SR560 to input oplev (one from the OPO test setup, one from the elec shop).

We reinstalled the shift PSD and a steering mirror on the rail and centered the PSD.

Note that the tilt PSD and its steering mirror are really close to the rail so the newly installed one have barely enough room to move.