Warning: Undefined variable $s in /wwwsto01/wwwusers/gw-elog/osl/classes/DAO.php on line 959
NAOJ GW Elog Logbook
LOG-IN
Displaying report 1-1 of 1.
R&D (FilterCavity)
Print this report.
NaokiAritomi - 17:34, Thursday 03 February 2022 (2828)Get code to link to this report
Input oplev spectra after evacuation

After the evacuation of input chamber, I aligned the input oplev by tweaking the steering mirror just after the oplev laser source.

Then I measured the input oplev spectra as shown in the attached figure. The input pitch and yaw oplev spectra look very similar now.

I checked the oplev beam height at the injection, readout viewports. The oplev beam height at the injection, readout viewports were 110mm, 106mm, respectively. I tweaked the injection steering mirror and made the both beam height 110mm, but the pitch and yaw oplev spectra still look very similar.

Images attached to this report
2828_20220203093412_20220203input.png