Warning: Undefined variable $s in /wwwsto01/wwwusers/gw-elog/osl/classes/DAO.php on line 959
NAOJ GW Elog Logbook
LOG-IN
Displaying report 1-1 of 1.
R&D (FilterCavity)
Print this report.
YuhangZhao - 23:57, Thursday 21 November 2019 (1865)Get code to link to this report
The characterization of squeezing after the optimization of homodyne

Yao-Chin and Yuhang

For the optimization of homodyne, we basically align again the homodyne. Including the matching of IRMC/AMC and OPO/AMC, the balance of homodyne, the beam height regulation.

The situation of IRMC/AMC matching is 99.95% while OPO/AMC is 99.7%.

The balance of homodyne now is done without aligning its BS but by aligning the lens before homodyne.

Benefit from not aligning homodyne BS, we could make squeezing go to homodyne flatly. Also, in this case, the balance of homodyne is easier.

After this work, we characterize squeezing again. We measured squeezing and anti-squeezing for power from 20mW to 60mW with an interval of 5mW. The result is shown in the attached first figure. 

In the attached figure 2, we see there was a peak appearing. I need to mention that this peak appears after we did several measurements.

By fitting the squeezing and anti-squeezing, we could find out the loss and phase noise information. However, this time, the fitting and raw data has a larger discrepancy.

#############

I am sorry that I forgot to put the information about the Green power and demodulation phase.

green pump power MZ offset OPO temperature p-pol locking frequency CC2 demodulation phase(sqz) CC2 demodulation phase(asqz)
20 4.1 7.166 175 75 160
25 4.2 7.167 175 90 170
30 4.3 7.18 175 100 175
35 4.4 7.18 175 120 170
40 4.5 7.19 180 120 160
45 4.6 7.19 170 125 155
50 4.7 7.19 150 125 160
55 4.8 7.195 150 125 155
60 4.9 7.2 150 135 155

#############

In the last attached figure, we can see the fit without considering the sqz-asqz for 55, 60mW.

Note: the anti-squeezing level is lower than the measurement did last week. This may come from the alignment issue of green pump.

Images attached to this report
1865_20191121154504_figure1.png 1865_20191121155736_peak.png 1865_20191121155743_fit.png 1865_20191122050938_fit2.png
Comments related to this report
NaokiAritomi - 00:35, Friday 22 November 2019 (1866)

Did you tune CC2 demodulation phase for each green power?