Warning: Undefined variable $s in /wwwsto01/wwwusers/gw-elog/osl/classes/DAO.php on line 959
NAOJ GW Elog Logbook
LOG-IN
Displaying report 1-1 of 1.
KAGRA VIS (OSEM)
Print this report.
TomotadaAkutsu - 18:28, Saturday 18 July 2015 (137)Get code to link to this report
Fixing coil wires to OSEM coil bodies by a vac seal

Four 30 out of 36 washed pieces of the OSEMs, the coil wires are fixed to their bodies by a vac seal, and now being cured (for one or two days) in the ATC ISO-1 clean booth. I need more vac seals.

I use nozzles but the viscosity of the vac seal is so high that my grip now reduces forces..

Images attached to this report
137_20150718112639_dcim1333.jpg
Comments related to this report
TomotadaAkutsu - 13:18, Wednesday 22 July 2015 (140)

The 30 pieces of the coil bodies are "doubly" packed into clean polyethylene packs (made in a class-100 room, the provider said) in the ATC ISO-1 clean booth. Will be sent to KEK soon.

TomotadaAkutsu - 22:17, Saturday 10 October 2015 (182)


The Remaining 37 OSEMs are now being cured in the ISO-1 clean booth in the ATC multipurpose experimental room!



Don't touch them for a couple of days.



Previously I did this 30 OSEM coils, and today 37coils, that means there will be 67 OSEMs in total. The number is sufficient for iKAGRA, but not for bKAGRA, as at least 70 OSEMs will be required for the bKAGRA (PRM, PR2, PR3, BS, SRM, SR2, SR3).



There are some OSEM coils  washed or unwashed and used for trials of several process for the assembly, and they should be added to the number to fulfill the required numbers.




TomotadaAkutsu - 18:31, Thursday 24 September 2015 (183)

37 OSEM coil bodies are now packed into clean bags. (Akutsu, Fujii)

TomotadaAkutsu - 23:29, Wednesday 30 September 2015 (187)

Plus 5 OSEM coil bodies are washed (by ethanol), and then 67+5 = 72 OSEM coil bodies will be available in the end.