RyutaroTakahashi - 15:43, Monday 08 June 2015 (91)
Replacement of the breadboard in MCE
Member: N. Ohishi, H. Ishizaki, M. Barton, R. Takahashi

May 26
Checking condition of the clean booth at 1530-17:00 by Takahashi.
1) Turned on all (16) filters. 4 filters had been working before.
2) Hirose-san measured particles by the large counter. I measured particles by the small counter too. Number of particles was 5/L just after turnung on the filters. Humidity was 80.5%.
3) Hirose-san measured particles continuously during I walk around.

May 27
Replacement of the breadboard (1).
1) Cleaned the floor of the clean booth by the vacuum cleaner and the mope.
2) Opened the chamber.
3) Moved the optical bench into the clean boooth by the jib crane.
4) Extracted the suspension from the chamber and put it on the optical bench.
5) Extracted the breadboard. Up-down movement of the crane (chain block) is very slow.
6) Rapped the breadboard.

May 28
Replacement of the breadboard (2)
1) Cleaned the floor of the clean booth by the mope.
2) Cleaned inside the chamber by the vacuum cleaner, the wet wiper, and the dry cloth.
3) The SUS blocks were stacked after first disassembling. Since the guid rods are inside the MCF chamber, we don't use them. The crane can not move to ransverse direction. This is a problem.
4) Unpacked the renewaled breadboard and installed it into the chamber.
5) The breadboard extracted was enclosed by the wood box.
6) Rapped the suspension with decicant.
7) Closed the chamber.