R&D (FilterCavity)
RaffaeleFlaminio - 23:53, Thursday 16 March 2017 (417)
Opening of the PRM chamber and installation of the Faraday Isolator
Participants: Ishizaki, Marchio, Guo, Capocasa, Tacca, Flaminio

Tuesday, March 14th, 2017

Morning
We close the MC vacuum chamber.
We move the clean-booth around the PRM vacuum chamber.
We opened the PRM vacuum chamber. Then we installed the clean-booth ceiling and run the clean air flux.
We clean the vacuum chamber as well as the floor around the PRM vacuum chamber.

Afternoon
We installed the Faraday-Isolator inside the PRM vacuum chamber.
While doing that, we moved the two steering mirrors equipped with picomotors from
the Faraday Isolator platform on two independent posts so to place them at the right positions
(drawing and pictures will be added later).
The mirrors are mounted on 7" tall posts so to have the mirrors center at the
correct height i.e. 120 cm from the ground and 21.3 mm from the optical bench which
is the same height as the suspended mirror.