Participants: Ishizaki, Marchio, Guo, Capocasa, Tacca, Flaminio
Monday, March 13th, 2017
Morning
We moved the PRM clean-booth around the MC chamber.
We open the top of the MC vacuum chamber and protected the inside of the
vacuum chamber with a plastic sheet.
We then install the clean-booth ceiling and operate the air flux.
Afternoon
We remove the Faraday-Isolator as well as the two steering mirrors from the MC chamber.
The two steering mirrors are equipped with picomotors.
Together with the Faraday-Isolator block we removed the corresponding four
beam dampers (pictures will be added later).
We left the cable used to drive the picomotors inside the MC vacuum chamber.