R&D (FilterCavity)
EleonoraCapocasa - 22:48, Monday 28 November 2016 (335)
BS suspension installation

Workers: Tatsumi, Takahashi, Yuefan, Eleonora

This morning the BS mirror has been successfully suspended and the suspension has been installed in the BS chamber.

Coils have been connected as shown in the first attached picture. 

Images attached to this report
335_20161128140648_coilbs.png 335_20161128140727_bs1.jpg 335_20161128140807_bs3.jpg 335_20161128140837_bs4.jpg 335_20161128140907_bs2.jpg 335_20161129120320_coilsflange.png