R&D (Cryogenic)
RishabhBajpai - 09:32, Wednesday 08 November 2023 (3334)
Cryostat Work

I removed the FP cavity from the cryostat in ATC in prepration for cabling work.

The folded cavity optical table is now very crowded (being used by Mitsuhashi-kun and myself).

I want to remove the aluminium frame and foil from the optical table in front of the air-conditioning unit. Is it acceptable?