R&D (Cryogenic)
RishabhBajpai - 17:36, Friday 06 October 2023 (3324)
Diassembling nodal support setup for cleaning
The nodal support system (fig. 1) was delivered to NAOJ this Monday (10/02).
Today, I disassembled the setup for cleaning.
I did not have the CAD drawing, so I winged the disassembly and only broke the electrostatic actuator.
The components are now on the optical table in plastic bags (fig. 2).
I will clean them and reassemble the setup next week (probably Wednesday).

Images attached to this report
3324_20231006103420_1.jpg 3324_20231006103430_2.jpg