Birefringence mitigation (General)
ShalikaSingh - 16:06, Thursday 14 September 2023 (3318)
BS added to the setup

[Shalika, Gabriella]

The setup was modified and two beam splitters were added (before and after LCs). The measurement to calibrate the beam splitters (both reflection & transmission) were taken as well (done without LCs).