R&D (FilterCavity)
DaisukeTatsumi - 18:23, Sunday 20 November 2016 (331)
BS suspension wire setting

[GOOD NEWS]   I successfuly hang BS dummy mass with four tungsten wires of 100 micron.

[BAD NEWS]    Dumping mass of the intermediate mass is missing.

Together with this mass, strong magnets and two hanging rods are needed.

[21 Nov.] I found these at bottom of rack for absorption measurement system.

Another missing parts are base plates to sit 10 cm diameter masses for hanging JIG.

I recommend to keep whole parts in one container box.

Images attached to this report
331_20161120102259_rimg0033.jpg 331_20161120103046_rimg0101.jpg
Non-image files attached to this report