R&D (FilterCavity)
MarcEisenmann - 16:05, Wednesday 25 May 2022 (2956)
Comment to Trial to check END oplev coupling (Click here to view original report: 2955)

Marc, Michael

We checked the END oplev SR560 and found out that the length oplev one was saturating.

We decreased the gain of all down to 1 and realigned all signals. After that we increased the gain back to 100.

For reference, the tilt PSD sum is about 4500 counts and shift PSD sum is about 3000 counts.