NaokiAritomi - 14:34, Monday 18 April 2022 (2930)
Comment to input/end chamber evacuation (Click here to view original report: 2929)

I opened the gate valves between input/end and arm. Before I opened the gate valve between input/arm, the pressure of input and arm were 1.2e-6 mbar and 3.7e-8 mbar, respectively. After I opened the gate valve, both of them became 1e-6 mbar. Before I opened the gate valve between end/arm, the pressure of end and arm were 2e-7 mbar and 1.5e-7 mbar, respectively. After I opened the gate valve between end/arm, the pressure of end and arm became 4e-7 mbar and 5.4e-7 mbar, respectively.