R&D (FilterCavity)
YuhangZhao - 13:44, Tuesday 12 October 2021 (2707)
Check of filter cavity mirror suspension on 2021/10/12

Michael and Yuhang

We checked filter cavity alignment yesterday. The pico-motor of PR/BS and END mirrors are moved. The movement of PR is to recover its reference on BS chamber. The movement of BS is to recover its reference in filter cavity transmission camera. The movement of END mirror is to recover the flash.

After these movement, we checked the oplev spectrum as attached in this elog. They look fine. So this time, no touching issue of mirror was found.

Images attached to this report
2707_20211012064423_vis202110122.png 2707_20211012064428_vis202110123.png