R&D (FilterCavity)
YuhangZhao - 11:45, Monday 08 March 2021 (2389)
Efforts making bench able to be closed

Michael and Yuhang

We replaced the big mirror mount in front of AMC with a compact one. (attached figure 1: the replaced mirror. attached figure 2: the gap between replaced mirror and board)

We have made homodyne DC cable, homodyne power cable, AMC DC PD power cable go through the appropriate hole. (figure 3: extended cable on homodyne power side. figure 4: current cables situation around homodyne)

To close bench, we still need to drill holes on board to let GR inj/ref and IR inj/ref go through (three holes are expected). 

Images attached to this report
2389_20210308034454_wechatimg732.jpeg 2389_20210308034500_wechatimg731.jpeg 2389_20210308041051_wechatimg733.jpeg 2389_20210308041056_wechatimg734.jpeg