R&D (Cryogenic)
SatoshiTanioka - 19:44, Monday 03 August 2020 (2139)
Installation of temperature sensors and alignment work

What I did

Today, I attached two temperature sensors using indium foil on the breadboard and mirror holder, respectively.
Then I did alingment of input optics and confirmed that the cavity can be locked.

After that, I closed the chamber and started roughing.

Next Step

I will measure the finesse of the cavity at room temperature tomorrow.
Then I will start cooling down.