Workers: Eleonora, Tatsumi, Takahashi
Today we completed the installation of the vibration isolation system needed to suspend the filter cavity input mirror in the NM2 vacuum tank.
Such a system is composed by (from bottom to top):
In picture 3 the empty bottom of the vacuum tank is showed while in picture 4 the complete system can be seen.
Some test of vibration isolation are planned for the next days.