KAGRA MIR (Absorption)
SimonZeidler - 22:47, Wednesday 08 January 2020 (1960)
Continuation of upgrading the PCI

Pengbo, Simon

Today, the upgrading process was continued by setting everything except the FI in its determined position, according to the draft which is attached to this report.
As for a matter of understanding, this draft is a supposed to be a first trial of the basic working principle which we are aiming for.

By re-activating the laser, I recognized that if the first PBS is set plane in its position as indicated in the draft, only a few percent of power would be P-polarized. Therefore, I rotated the PBS so that the non-used beam would be weakest. With this, I planted a beam-dump on top of the PBS cube (thanks to Thorlabs cage system) to catch that beam. In my opinion, even with this a little bit strange setup, security is maintained. In a next step, the motorized HWP was tested with the laser and confirmed to be working fine.

Addendum: I set also a beam-dump on the second PBS to cover the non-used S-polarization.

Images attached to this report
1960_20200108144821_pciupgrade.png