R&D (FilterCavity)
NaokiAritomi - 00:56, Friday 05 July 2019 (1439)
Improvement of IR alignment

[Aritomi, Eleonora P&C, Yuhang]

Today we tried to improve IR alignment into filter cavity.

First we increased green power to 68mW. OPO temperature is 7.2 kOhm and p pol PLL frequency is 150 MHz. IR injected into filter cavity is around 13mW. Then we locked IR on TEM00 and maximized TEM00 by aligning two steering mirrors for IR. During IR alignment, green transmission was above 5000.

Since lock of green phase is not stable, we scanned green phase with 10Hz and 1.3Vpp. Then we scanned AOM frequency at 2 mHz. After the scan, we locked IR on TEM00 and HG10,01 and measured each power with dataviewer. We repeated alignment of IR and AOM scan twice. Attached pictures show cavity scan. IR transmission when IR is locked on TEM00 and HG10,01 is as follows.

After scan 1

AOM frequency (MHz) IR transmission  mode
109.036 100 - 2000 TEM00
109.43 100 - 400 HG10

After scan 2

AOM frequency (MHz) IR transmission mode
109.03646 100 - 3800 TEM00
109.43133 100 - 270 HG10
109.432 100 - 400 HG01

This scan seems strange and is not compliant with measurement when IR is locked due to green phase scan. Pic 3 shows TEM00 in scan 2. Given that linewidth of filter cavity is 100Hz and AOM scan speed is 8kHz/s, frequency of green phase scan should be higher than 80Hz. Actually we tried 1kHz once, but TEM00 peak hight became smaller.

Anyway now TEM00 is 10 times larger than highest HOM. It seems that mode mismatch is small. We'll continue the alignment tomorrow.

Note
I found that there is time difference between time in diaggui and movie even though we start measurement and movie at the same time. It seems that diaggui starts measurement around 40 s after we push start button.
Images attached to this report
1439_20190704175556_screenshotfrom20190704201412scan1.png 1439_20190704175604_screenshotfrom20190704201321scan2.png 1439_20190705061253_tem00.png