General (General)
EleonoraCapocasa - 14:09, Tuesday 02 July 2019 (1431)
TAMA recovery after power shutdown

[Takahashi-san, Yuhang, Eleonora C]

Last sunday afternoon (30/06) we recovered TAMA vacuum, air conditioning, dehumidifier system and DGS after the planned shutdown on 29/06.

Some details on the procedure can be found in the attached PDF.

Note that while I was In the end room I heard a short but very strong noise (as a small explosion). Takahashi-san told me that it is likely to be due to the presence of air bubble in the dehumidification water pump during the restarting process.

Non-image files attached to this report