R&D (FilterCavity)
EleonoraCapocasa - 15:19, Tuesday 16 April 2019 (1302)
PR yaw loop closed with new DGS

After solving the DGS issue with the filter loading, I could test the simulink model on the control of YAW of PR.

The mechanical TF and the closed loop TF are shown in pic 1 and 2.  The comparison between the open and closed loop spectrum is shown in pic 3. The control seems to work fine.

UGF is at ~ 6 Hz and phase margin is ~ 50 deg.  A first, rather basic version of medm screen developped for the control is shown in pic 4.

Error and correction signals are currenty in counts and needs to be calibrated.

Images attached to this report
1302_20190416082226_prtf160419.png 1302_20190416082235_olpryaw160419.png 1302_20190416082244_spectrapryaw150419.png 1302_20190416082251_medmpr.png