R&D (FilterCavity)
YuhangZhao - 23:45, Thursday 17 January 2019 (1178)
situation on bench after remove second FI

[Aritomi, Yuhang]

1. Achieved lock of SHG, GRMC and MZ. The power going to OPO now is 45mW.

2. BAB beam power now is 145mW.